Seal the asbestos. Stop the leaks. Keep the site working.

A coating system for ageing asbestos cement roofs — applied with or without sprayed foam insulation. The sheets stay where they are, sealed under a seamless, fully-adhered coating, while your building carries on working underneath.

  • Cooler in summer — white reflective finish
  • Warmer in winter — with the foam option
  • No strip-out, no asbestos sheets to landfill

Photos, drawings and asbestos registers (PDF) can be uploaded with the form.

Asbestos roof encapsulation & waterproofing
0asbestos sheets stripped or sent to landfill
0.87initial solar reflectance, GacoFlex S42 white (manufacturer data)
6.40 → 0.81roof U-value, W/m²K — foam option, 25 mm, indicative
Up to 20 yrmanufacturer warranty on S42 when applied to spec
The problem

Most asbestos cement roofs are still sound. Everything around the sheets is failing.

Thousands of factories, warehouses and distribution sheds across the UK, Ireland and Europe still sit under asbestos cement roofs.

The trouble is rarely the sheet itself. It is the leaking laps and fixings, the moss, the condensation dripping onto stock and production lines, a roof that bakes in summer and leaks heat all winter — and the cost and disruption of stripping it all out.

Duratite cleans the sheets with controlled low-pressure methods, then seals and waterproofs them under a seamless coating: GacoFlex S42 silicone on its own, or — where the building also needs insulating — over a layer of sprayed closed-cell roofing foam with a silicone or urethane finish. Either way the asbestos stays put and sealed in, and the roof stops leaking.

Moss and lichen growing over corrugated asbestos cement roof sheets before treatment
Before: moss and lichen across weathered asbestos cement sheets on a working estate.
Remove, over-roof or encapsulate?

Most sound asbestos roofs don’t need to come off.

Stripping an asbestos cement roof means the most disturbance of the material, a controlled-waste stream, and a building open to the weather until the new roof is on. Where the sheets are sound, a coating seals them in, stops the leaks and reflects the sun — leaving the asbestos exactly where it is.

Strip & replaceOver-roof (new sheets over the old)Seal in place — Duratite coating
AsbestosSheets broken out, wrapped and removed — the highest-disturbance option.Old sheets stay, enclosed under a new sheeted roof.Sheets stay in place, cleaned with controlled low-pressure methods and sealed in under the coating.
WasteHazardous waste consignment, haulage and landfill for every sheet.No sheet waste, but a full new roof of materials to make and deliver.No sheets removed; only cleaning debris is bagged and disposed of as asbestos waste.
OperationsAreas below often cleared, protected or shut while the roof is open.A new roof structure to install over the old one.Work from above, building by building; the site keeps running.
Weather riskRoof open between strip and new cladding.Existing roof stays on during the works.Existing roof stays on throughout; each pass sealed the same day where weather allows.
WaterproofingNew laps and fixings to maintain.New laps and fixings to maintain.Seamless membrane across laps, fixings, upstands and gutters.
Summer heatDepends on the new sheet colour.Depends on the new sheet colour.White finish available on every option. S42 white: 0.87 initial solar reflectance (data sheet); reflective white urethane top coat available.
Winter heat lossOnly improves if an insulated panel is specified.Only improves if insulation is specified.Foam options: indicative 6.40 → 0.81–0.60 W/m²K. Coating only adds no insulation.
RecordsAsbestos removed from the register once cleared.Asbestos stays on the register, now hidden under a new roof.Asbestos stays on the register as sealed, with a condition record per building.

Encapsulation is the right answer when…

  • the sheets are sound enough to work on with crawl boards and to bond to (we adhesion-test first);
  • the building must stay in use, or a re-roof would mean moving stock or plant;
  • you want waterproofing and a reflective finish — plus insulation if needed — without a re-roof.

…and it isn’t when

  • sheets are badly broken, delaminating or structurally unsafe;
  • the building is due for demolition or major alteration soon;
  • you have decided the asbestos must leave the site entirely. Then replacement is the route, and we will say so.
What changes

Six things change when the roof is sealed.

Every option

Asbestos managed in place

Sound sheets are cleaned and sealed under a seamless coating, so the fibres stay locked in. No strip-out, no asbestos sheets to landfill, no re-roof.

HSE guidance: asbestos in good condition and unlikely to be damaged should be left in place and managed. CAR 2012 reg. 4 sets the duty to manage.

Every option

Leaks stopped

A fully-adhered membrane runs across side and end laps, fixing heads, rooflight upstands and gutters — the places old roofs actually leak.

S42 data sheet: 0% water swelling; designed for roofs that pond.

Every option

Cooler in summer

A white reflective finish throws back much of the sun, so less heat soaks through the roof into stock, people and plant.

S42 white: solar reflectance 0.87 initial, SRI 110 (data sheet). Option C: reflective white urethane top coat available.

Foam option

Warmer in winter, no drips

Where heat loss matters, closed-cell roofing foam under the coating insulates a roof that has almost none — and keeps the sheet underside above the dew point, so condensation stops dripping.

Indicative, foam options only: U-value 6.40 → 0.81 W/m²K at 25 mm; underside 6.5 → 16.5 °C.

Every option

A lower-carbon route

No replacement sheets to manufacture and deliver, no asbestos sheets to landfill, less summer heat gain under a white finish — and, with foam, less winter heat loss.

We supply per-building U-value calculations for your energy and ESG reporting.

Every option

Your site keeps operating

Work is done mainly from the roof, one building or one pitch at a time. No internal scaffold, no roof left open to the weather, no stock moved out.

Proof: three roofs on a live packaging plant, no shutdown (see the case study below).

Gutter sealed with a seamless coating alongside a coated asbestos cement roof
Gutters, laps and fixings sealed in one seamless layer.
Closed-cell roofing foam being sprayed over cleaned asbestos cement sheets
Foam option: closed-cell foam sprayed over the cleaned sheets.
Asbestos cement roof finished in a white reflective coating, seen from above
Finished: a white reflective coating across the whole roof.
Thermal performance

One roof, two seasons.

An old single-skin asbestos roof does almost nothing thermally: it soaks up summer sun and lets winter heat straight out. The white reflective finish deals with the sun; the optional foam layer deals with the cold.

Summer · white finish
87% reflected

GacoFlex S42 white starts at a solar reflectance of 0.87 and is rated 0.69 after three years’ weathering, with thermal emittance 0.89–0.90 and SRI 110 initial / 84 aged (manufacturer data).

Illustration: 800 W/m² of summer sunAbsorbed
S42 white, new (0.87)104 W/m²
S42 white, 3-yr aged (0.69)248 W/m²
Every 0.10 gain in reflectance−80 W/m²

The EU Cool Roofs project’s monitored case studies showed 10–40% energy savings and 1.5–2 °C lower indoor temperatures, depending on climate.

Winter · foam options only
U 6.40 → 0.81

A coating alone adds no meaningful insulation. Where heat loss matters, closed-cell roofing foam under the coating adds thermal resistance and seals laps. Indicative figures:

Roof build-upU, W/m²KHeat loss*Underside†
Bare AC sheet6.4096.0 kW6.5 °C
+ 25 mm foam0.8112.2 kW16.5 °C
+ 35 mm foam0.609.0 kW16.9 °C

Roughly an 87% (25 mm) to 91% (35 mm) cut in steady-state heat flow per square metre — and the sheet underside stays above the 10.1 °C dew point of 18 °C / 60% RH air, so it stops dripping.

* Per 1,000 m² of roof with a 15 °C inside–outside difference. † Underside surface at 18 °C inside, 0 °C outside. Indicative, not a guarantee: BS EN ISO 6946 layer sum, steady state, Rsi 0.10 / Rse 0.04 m²K/W; 6.5 mm asbestos cement sheet at an assumed λ 0.40 W/mK (0.30–0.60 moves the bare figure only from 6.2 to 6.6); foam at the manufacturer’s declared λ 0.0233 W/mK at nominal thickness; no allowance for rooflights, fixings or corrugation. Sun figures are (1 − reflectance) × 800 W/m², an illustrative clear-sky value. We calculate every building individually after survey, including a condensation risk check. UK context: days above 30 °C have more than trebled, from 0.7 a year (1961–90) to 2.5 a year (2015–24) — Met Office, State of the UK Climate 2024.

Three ways to coat the roof

A coating on every roof. Foam only where it earns its place.

Every option starts the same way: survey, controlled low-pressure clean with a biocidal cleaner, adhesion test, repair of broken sheets, and detailing of laps, fixings, upstands and gutters. Then choose:

White GacoFlex S42 silicone coating applied across corrugated asbestos cement roof sheets
Option A

GacoFlex S42 silicone coating only

  • GacoFlex S42 100% silicone, two coats
  • Existing asbestos cement sheet

Encapsulation, waterproofing and a reflective white silicone finish, with no insulation layer — the quickest, lightest option. Up to 20-year manufacturer warranty when applied to spec.

Choose this when the priority is sealing the asbestos and stopping leaks, and the building doesn’t need insulating — stores, canopies, unheated sheds, retail roofs.

Aerial of a sawtooth asbestos cement roof finished with foam and GacoFlex S42 silicone
Option B

Sprayed foam + GacoFlex S42 silicone top coat

  • GacoFlex S42 100% silicone
  • Sprayed closed-cell roofing foam
  • Existing asbestos cement sheet

The same silicone coating over a layer of closed-cell foam: UV-stable, ponding-resistant and insulated. Up to 20-year manufacturer warranty on the S42 when applied to spec.

Choose this when you want summer cooling and winter insulation together, or condensation drips need to stop.

Asbestos cement roof half covered in sprayed closed-cell foam, the untreated half showing the weathered sheets
Option C

Sprayed foam + urethane base & top coat

  • Urethane top coat
  • Urethane base coat
  • Sprayed closed-cell roofing foam
  • Existing asbestos cement sheet

Insulation plus a tough, seamless two-coat urethane membrane, with a reflective white top coat available. Warranty terms confirmed per project.

Choose this when the building is heated and the roof takes regular maintenance traffic.

Many estates use coating only on most roofs and add insulation just on the heated buildings that need it. Not sure which fits? Send us photos and we will recommend one per building.

0.87Initial solar reflectance, GacoFlex S42 white
FM & ULFM Approved; UL 790 Class A (S42)
0.0233Roofing foam declared λ, W/mK
Up to 20 yrManufacturer warranty on S42 when applied to spec
Top coat · options A & B

GacoFlex S42 silicone

Seals and waterproofs the roof with a seamless, reflective white membrane that tolerates ponding.

Chemistry
100% silicone, solvent-free
Solar reflectance (initial / 3 yr)
0.87 / 0.69
Thermal emittance (initial / 3 yr)
0.89 / 0.90
Solar Reflectance Index (initial / 3 yr)
110 / 84
Elongation at break
196%
Water swelling
0%
VOC
< 50 g/L
Approvals
UL 790 Class A; FM Approved
Insulation · options B & C

Closed-cell roofing foam

Adds insulation and self-bonds to the cleaned sheet; always over-coated, never left exposed to UV.

Thermal conductivity (declared)
0.0233 W/mK
Closed-cell content
min 90%
Density
min 50 kg/m³
Compressive strength at 10%
≥ 300 kPa
Water absorption
≤ 0.14 kg/m²
Standard
CE marked, EN 14315-1
Typical thickness on AC roofs
25–35 mm
Finish
S42 silicone or urethane top coat

Sources: GacoFlex S42 Series Product Data Sheet rev 06/2025; the manufacturer’s technical data sheet and declaration of performance for the roofing foam we install. We only quote figures that appear on a manufacturer’s data sheet. More on the coating: GacoFlex S42 silicone roof coating. Duratite is the official Gaco distributor for the UK and Europe.

How it works on a live site

Built around a site that never stops.

Asbestos cement roofs are fragile, and the sheets must not be broken or abraded. Our method is planned for that — and for production carrying on below.

  1. Survey & condition check

    Asbestos survey reviewed, sheet condition and fixings checked, adhesion tested, drainage and rooflights mapped.

  2. Access & protection

    Edge protection, safety netting or staging, crawl boards and exclusion zones agreed with your site team.

  3. Controlled clean

    Biocidal cleaner and low-pressure rinsing — no high-pressure jetting, no abrasion. Debris bagged as asbestos waste.

  4. Repair & detail

    Cracks, laps, fixings, upstands and gutter junctions sealed before the main system goes on.

  5. Foam, if specified (B & C)

    Closed-cell roofing foam sprayed in passes to the specified thickness; depths probed and recorded.

  6. Coat & QA (every option)

    Coats applied by spray, roller or brush; wet-film readings logged (S42: every 20 m²).

Crawl boards laid over fragile asbestos cement roof sheets for safe access
Crawl boards over the sheets.
Sawtooth asbestos cement roof covered in sprayed closed-cell foam ready for its coating
Foam option: insulation down, ready to coat.
Wet-film gauge reading taken on fresh roof coating over corrugated sheets
Wet-film readings logged by area.
Depth probe checking sprayed foam thickness on an asbestos cement roof
Foam depths probed and recorded.

Site controls we plan for

  • Risk assessment and method statement per building
  • Notification of notifiable non-licensed work where it applies
  • Trained operatives, RPE and disposable coveralls
  • Decontamination and waste-bagging arrangements
  • Isocyanate controls when spraying insulation
  • Plant intakes, vents and flues protected or isolated
  • Phasing agreed around production and deliveries
  • Daily progress photos and signed-off hold points

UK guidance: HSE asbestos essentials sheets a12 (cleaning weathered AC roofing) and a16 (painting AC products) describe these as non-licensed tasks with defined controls.

Multi-site roll-out

Survey once. Prove it on one building. Then roll it out.

For operators with several sites — across the UK, Ireland or mainland Europe — we run encapsulation as a programme, not a string of one-off jobs. The same method, the same records, the same point of contact.

  1. Estate survey

    Desk review of your asbestos registers and roof plans, then site surveys of sheet condition, adhesion, drainage and access.

    Output: a ranked list of roofs, the right option for each — and which should not be encapsulated.
  2. Pilot building

    One roof treated first, with your EHS and engineering teams seeing the method, the controls and the finish on their own site.

    Output: a proven method statement, timings and site rules to repeat.
  3. Programme

    Remaining roofs phased by building or pitch around production, weather and budget years. Crews and materials planned across sites.

    Output: programme per site, weekly progress photos.
  4. Records & handover

    Per-building record pack, warranty registration where the system carries one, and a re-inspection plan.

    Output: one consistent file per site for your register and auditors.
Aerial of a manufacturing estate, stage one: first asbestos roof coated, second insulated, third untreated
Stage 1. First roof sealed and coated; second insulated; third untreated.
Aerial of the same estate, stage two: two asbestos roofs complete and the third being insulated pitch by pitch
Stage 2. Two roofs complete; insulation starting on the third, pitch by pitch.
Aerial of the completed programme: all three asbestos cement roofs sealed and coated while the plant ran
Complete. All three roofs done — the plant ran throughout.

What every site receives

  • Survey and condition notes with photos of every roof elevation
  • Adhesion test results and the system chosen, with reasons
  • Risk assessment and method statement for that building
  • Coating wet-film readings and insulation depths, logged by area
  • Dated progress and completion photography, including aerials where possible
  • Indicative before/after U-value calculation (insulated roofs)
  • Waste records for cleaning debris
  • Warranty registration where applicable, and a re-inspection plan
Flagship case study

Three asbestos roofs. One live packaging plant. No shutdown.

Three asbestos cement roofs on a working packaging plant in Northern Ireland were cleaned, insulated with sprayed closed-cell roofing foam and coated — building by building, while production carried on below.

Urethane base and top coat on the first two roofs; GacoFlex S42 silicone on the third, a ten-pitch sawtooth. Work was done mainly from the roof, one building and one pitch at a time.

7,330 m²roof area
3buildings
35 mmnominal foam
0days shutdown

The client and site are not named. Full case study available on request.

Weathered asbestos cement roof on the packaging plant before work startedBefore
Coated asbestos cement roofs on the packaging plant with process steam rising as production continuesAfter
Ten-pitch sawtooth asbestos cement roof finished in grey GacoFlex S42 silicone
Third roof: foam plus GacoFlex S42 silicone on a ten-pitch sawtooth.
Retail building with a weathered grey asbestos cement roof before coatingBefore
The same retail building roof after cleaning and coating in white GacoFlex S42 siliconeAfter — S42
Coating only — option A in practice

A busy retail building, doors open throughout.

A weathered asbestos cement roof over a busy retail building was cleaned, sealed and coated in GacoFlex S42 silicone, with the doors open below the whole time.

No insulation was needed — just S42 silicone for waterproofing and encapsulation. It is a good example of why coating-only is a first-class option, not a cut-down one.

Beyond the roof

The case for your ESG and compliance teams.

Aerial of a large asbestos cement factory roof finished in a white reflective coating
Sealed in place under a white reflective finish — no asbestos sheets removed.

Carbon & sustainability

No asbestos sheets go to landfill and no new roof sheets are made. We give your energy consultant per-building areas, build-ups and indicative U-values to model real savings; we do not publish a carbon figure.

Duty to manage

The Control of Asbestos Regulations 2012 (reg. 4) require dutyholders to find and manage asbestos. Sealed sheets stay on your register, with a record pack per building to support re-inspection; your survey decides suitability.

Roof life & maintenance

The coating takes the UV, rain and frost instead of the ageing sheet. At the end of its life it is cleaned and recoated rather than stripped, with walkways laid for routine maintenance traffic.

Tax & budgeting (UK)

Asbestos remediation may qualify UK companies for Land Remediation Relief, an enhanced corporation tax deduction; take tax advice on your facts. Building-by-building scoping lets a programme be phased across budget years.

Questions we get asked

Asbestos roof coating FAQs

Do you remove the asbestos?

No. Where the sheets are sound, they stay in place. We clean them with controlled low-pressure methods and seal them under a seamless, fully-adhered coating, so the fibres stay locked in. Only the cleaning debris is bagged and disposed of as asbestos waste.

Is it safe to coat an asbestos cement roof?

HSE guidance says asbestos in good condition and unlikely to be damaged should be left in place and managed. HSE asbestos essentials sheets a12 (cleaning weathered asbestos cement roofing) and a16 (painting asbestos cement products) describe these as non-licensed tasks with defined controls. We work to a risk assessment and method statement for every building; your asbestos survey and dutyholder decide what is suitable.

Do I need the spray foam?

Only if the building needs insulating or condensation drips need to stop. Coating only (option A) seals the asbestos, stops the leaks and gives the cooler-in-summer reflective finish. The foam options add winter insulation — an indicative U-value of 6.40 to 0.81 W/m²K at 25 mm.

Will the coating make the building cooler?

Yes. Every option can have a white reflective finish. GacoFlex S42 white has an initial solar reflectance of 0.87 (0.69 after three years); on option C a reflective white urethane top coat is available. European cool-roof case studies recorded indoor temperatures 1.5–2 °C lower, depending on climate.

What warranty do I get?

GacoFlex S42 carries an up to 20-year manufacturer warranty when applied to spec, on options A and B. For the urethane system (option C), warranty terms are confirmed per project.

Can the building stay in use while you work?

Yes. Work is done mainly from the roof, one building or one pitch at a time, with exclusion zones and phasing agreed with your site team. Our flagship programme covered three roofs on a live packaging plant with no shutdown.

Which roofs are not suitable?

Sheets that are badly broken, delaminating or structurally unsafe; buildings due for demolition or major alteration soon; or where you have decided the asbestos must leave the site. In those cases replacement is the route, and we will tell you so.

Does the asbestos stay on our register?

Yes — recorded as sealed, with a condition record per building. We hand over survey notes, photos, coating film readings (and insulation depths where used) to support your re-inspection.

Can you work across several sites, including Ireland and Europe?

Yes. For multi-site operators we start with one estate survey and one pilot building, then phase the remaining roofs as a programme with the same method and the same record pack on every site.

What do you need from me to get started?

A site address, a rough roof area and a few photos are enough to begin. If you have an asbestos register, roof drawings or a site list, upload them as PDFs with the enquiry form below and we will come back with a survey plan and the right option for each roof.

Related

More on asbestos roofs

Start with one survey

We’ll tell you honestly which roofs qualify.

Send us photos, a site list or your asbestos register and we will come back with a survey plan, the right option for each roof, and a pilot building to prove it on.

Free Site Survey

Get a Free Site Survey & Quote

Tell us about your building and we’ll recommend the right system — foam, waterproofing or both — surveyed, specified and quoted at no cost.

  • Reviewed by a Duratite specialist
  • No obligation, no hard sell
  • One team from survey to warranty
  • UK-wide coverage
01208 832 602
No obligation · We’ll never sell your details · Typical reply within 1 working day
★★★★★  Read genuine customer reviews on Trustpilot ↗
0 £0.00
Speak to a Duratite expert 01208 832 602